| 2 People | - | Preliminary discussion of concept change.
|
| 1 Person | - | Devise and write formal bulb architecture.
|
| 2 People | - | Feasibility study and timetable of events.
|
| 2 People | - | Produce four utilities to reduce screw-in time (in
addition to the electric utility).
|
| 1 Person | - | Maintain ISO and DEC standards (sockets, voltage, AC/DC).
|
| 4 People | - | Commonality task force on bulb change.
|
| 15 People | - | Change bulb.
|
| 5 People | - | Perform bulb functional test.
|
| 2 People | - | Perform bulb load test.
|
| 3 People | - | Perform bulb regression test.
|
| 1 Person | - | Perform bulb performance analysis.
|
| 1 Person | - | Perform bulb bottleneck analysis.
|
| 1 Person | - | Follow-up study (bulb merge feasibility). |
| 1 Person | - | Interface with Utilities Commission. |
| 1 Person | - | Interface with users. (Did they want incandescent when
we only supply non-tunable fluorescent point product?)
BAX (Bulbs Are eXpensive)! |
| 5 People | - | Perform BOSE (Build Other Socket Enhancements)
compatibility/architecture study. |
| 3 People | - | Ensure form (round/square, clear/frosted) follows
function (wattage, 120/140 volts, visible/ultraviolet,
flashing, flood/spot). |
| 3 People | - | Implement temporary alternative bulb socket for already
(!?) existing, successful, and profitable socket
(bulb-in-one). |
| 5 People | - | Determine how to market/package/distribute temporary
alternative bulb socket. |
| 10 People | - | Determine how to perform bulb change product split
(control - switches, dimmers; versus implementation -
screw-in torque, recovery strategies). |
| 1 Person | - | Interface with Utilities Commission quality assurance
group. |
| 1 Person | - | Submit to BDC (Bulb Distribution Center). |
| 1 Person | - | Set up BPR (Bulb Problem Reports) system. |
| 10 People | - | Answer customer BPRs. |
| 11 People | - | Football team to challenge bulb changers. |